Great Yarmouth Docks / January 2010
/This project was both unusual and time consuming! We were asked to pre-treat and paint the base sections of 5 off 30 meter sectional lighting columns that were to be placed at Great Yarmouth docks. It is the docks regulations that all roadway features must be painted in yellow and black bands. This took considerable time, patience and masking tape!